top of page
Search

MS720 Dual-Connector OP-919 Pallet Beam Replacement Indicator Compatibility Guide

Call (832) 290-3120 or email mnmscales@yahoo.com to confirm compatibility with your OP-919 or pallet-beam system.

MS720 Dual-Connector OP-919 Pallet Beam Replacement Indicator Compatibility Guide

MNM specifically lists the dual-input MS720 for OP-919 pallet beam scales or MyScale systems. That makes it a strong replacement candidate, but the correct decision still requires checking the exact connectors, load bars and configured scale capacity before plugging it in.

What to compare with your old indicator

Compare the number and style of rear load-cell connectors, connector pin assignment, load-cell excitation/signal requirements, full scale capacity, display division, units, power adapter, mounting arrangement and any printer/remote display connection. Take photos and label both load-bar cables before disconnecting the old indicator.

Two inputs are the key model distinction

This product is not simply an MS720 front panel. MNM explicitly states that the replacement has two load-cell connectors on the back for pallet beam use. That distinction matters when comparing it with single-input force-scale versions of MS720-family indicators.

What happens after the swap

A replacement indicator should not be expected to read accurately just because the connectors fit. Verify both beams contribute, set the proper capacity/division, perform unloaded zero and known-load span, then test several positions and loads. Save or document configuration values for future service.

RS-232 and peripheral compatibility

MNM lists full-duplex RS-232 for a remote display or printer. Before reconnecting an existing peripheral, confirm baud rate, data format, connector pinout and output mode. RS-232 compatibility requires more than the same physical connector.

When to call MNM before ordering

Contact MNM if the old indicator label is missing, the load-bar connectors have been modified, the scale capacity is unknown, the system uses custom serial equipment, or the beams were replaced with another brand. Provide photos of the old label, rear panel and connectors plus the scale capacity/division.

Main guide: https://www.allscalesusa.com/post/mnm-ms720-dual-connector-pallet-beam-indicator-guide Setup/calibration: https://www.allscalesusa.com/post/how-to-setup-calibrate-ms720-dual-pallet-beam-scale MNM product: https://mnmscales.com/product/myscale-ms720-lcd-indicator-with-dual-connectors-for-pallet-beam-scale-load-bars/

 
 
 

Comments


bottom of page